Cipher Mining · Colorado City, Mitchell County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Oncor Electric Delivery (Barber Lake 138 kV substation, ERCOT West). Front-of-meter: 300 MW, energized Sept 2024
Cipher (miner → HPC). Purpose-built, ground-up HPC campus (new build, not a converted mining hall)
Tenant-supplied (undisclosed). Anthropic did not specify; NVIDIA or Google TPU inferred
Fluidstack. Neocloud operator (anchor tenant)
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in Texas? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.
Tell us what you need →