Cipher Digital (formerly Cipher Mining) · Andrews, Andrews County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
ERCOT. Up to 100 MW; included in ERCOT's May 2026 Quarterly Stability Assessment, qualifying it as base load with capacity not subject to further study or reallocation; Q4 2026 energization
Cipher Digital (self-build). Purpose-built greenfield HPC campus at roughly $10.5M development cost per IT MW; as of Sep 30, 2026 earthwork, grading and pad preparation on schedule, underground electrical begun, concrete foundations and steel erection underway
Undisclosed (AWS deployment). Tenant-supplied; maybe AWS Trainium, not NVIDIA inferred
AWS. Tenant runs its own cloud and AI platform on the leased capacity; Cipher retains only property-level duties under the triple-net lease
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in Texas? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.