Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Duke Energy. Electric utility, 82 MW of gross utility capacity (the majority feed)
Murphy Electric Power Board (TVA). Local power company distributing TVA wholesale power, 35 MW of gross utility capacity
Core Scientific (in-house). Crypto-to-HPC conversion of the former American Thread plant (closed 2015; 70 acres, 250k sq ft; mining from 2018); cooling design not disclosed reported
NVIDIA. CoreWeave GPU fleet hosted at the site (models not disclosed) reported
Not disclosed. Tenant-controlled inferred
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in North Carolina? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.