Center Registry · Texas

Childress (Crusoe / Lancium)

Crusoe / Lancium · Childress, Childress County, Texas

Verified by Center RegistryChecked against 1 source, including primary filings and releases
Open on the map →
Undisclosed
Capacity not yet disclosed
0 MW
Energized today
not disclosed
First power
ERCOT
Grid region · location approximate
In brief

What makes it notable.

  1. A planned 1.0 GW campus on 270 acres in Childress, Texas, grid-connected to ERCOT, with construction start targeted for the third quarter of 2026.
  2. Lancium owns the land and manages the energy infrastructure, while Crusoe designs, builds and operates the data center.
  3. Cooling is closed-loop and non-evaporative liquid, and neither a first power date nor a full buildout date has been disclosed for the campus.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Lancium, ERCOT
Site and build
Crusoe
Compute
Not disclosed
Cloud operator
Crusoe
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. Nov 2026Today
  2. not disclosedFirst power
  3. not disclosedFull buildout
The detail

Each party's role.

Power

Lancium. Owns land, manages energy infrastructure reported

Power

ERCOT. Grid-connected campus reported

Site and build

Crusoe. Closed-loop non-evaporative liquid cooling reported

Compute

Not disclosed. GPU platform not disclosed inferred

Cloud operator

Crusoe. Designs, builds & operates the data center reported

Related sites

Nearby in the buildout.

All AI data centers in Texas →

Sources

The record behind this page.

Center Registry

Who keeps this record.

Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.

Need capacity in Texas?

Looking for GPU colocation or a campus in Texas? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.

Tell us what you need →