DataBank · Red Oak, Ellis County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Oncor. Utility; 400 MW Phase 1 substation delivering up to 240 MW critical IT power, expandable to 480 MW across all 8 buildings; DataBank credits existing power commitments plus the financing for an ~18-month schedule pull-forward reported
DataBank (Universal Data Hall Design). Ground-up build: 425k gross sq ft per 2-story building (200k sq ft data center space) on 292 acres reported
Not disclosed. HPC-ready spec: 45kW+/cabinet air, 100kW+/cabinet liquid, rear-door heat exchangers and water-to-chip supported reported
Not disclosed. Tenant-controlled inferred
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.