400 MW
Critical IT planned
250 MW
Energized today
2025-11
First power
MISO
Grid region · location approximate
In brief

What makes it notable.

  1. A purpose-built, liquid-cooled AI campus in MISO with an on-site Montana-Dakota Utilities substation energized in 2024, ahead of first power in November 2025.
  2. Current critical capacity is 250 MW with 400 MW planned, and the site reached first power in November 2025, with full buildout targeted for 2027.
  3. Blackwell-class NVIDIA clusters are reported per owner materials, deployed in a facility that Applied Digital self-built as an AI factory with liquid cooling.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Montana-Dakota Utilities (MDU), MISO
Site and build
Applied Digital (self-build)
Compute
NVIDIA (tenant-supplied)
Cloud operator
CoreWeave
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. 2025-11First power
  2. Nov 2026Today
  3. 2027Full buildout
The detail

Each party's role.

Power

Montana-Dakota Utilities (MDU), MISO. MISO transmission owner; on-site substation energized 2024

Site and build

Applied Digital (self-build). Purpose-built AI factory, liquid-cooled reported

Compute

NVIDIA (tenant-supplied). CoreWeave cluster; Blackwell-class per owner materials reported

Cloud operator

CoreWeave. Neocloud operator (anchor tenant)

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Center Registry

Who keeps this record.

Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.

Need capacity in North Dakota?

Looking for GPU colocation or a campus in North Dakota? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.

Tell us what you need →