Center Registry · Missouri

Crusoe Warrenton Campus

Crusoe · Warrenton, Warren County, Missouri

Verified by Center RegistryChecked against 5 sources, including primary filings and releases
Open on the map →
600 MW
Gross planned
0 MW
Energized today
2027-Q3
First power
MISO
Grid region · location approximate
In brief

What makes it notable.

  1. A 600 MW planned campus in Ameren Missouri territory (MISO), where Ameren owns the on-site switchyard, Crusoe owns the substation and Crusoe pays interconnection costs upfront under the PSC-approved large-load rate plan.
  2. Cooling is closed-loop chip-level liquid, with water use around 120,000 gallons a year from the Montgomery County water district and no new wells.
  3. Building 1 is targeted for full operations in the third quarter of 2027 and building 2 in the second quarter of 2029, on a 337-acre in-city site.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Ameren Missouri
Site and build
Southland Industries
Compute
Not disclosed
Cloud operator
Not disclosed
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. Nov 2026Today
  2. 2027-Q3First powerbuilding 1 full operations per Crusoe testimony
  3. 2029-Q2Full buildoutbuilding 2 operations
The detail

Each party's role.

Power

Ameren Missouri. Serving utility (MISO); Ameren owns the on-site switchyard while Crusoe owns the substation; interconnection costs borne by Crusoe upfront under the PSC-approved large-load rate plan reported

Site and build

Southland Industries. Mechanical/cooling contractor: closed-loop chip-level liquid cooling, ~120,000 gal/yr water use from the Montgomery County water district, no new wells; 337 acres in-city plus a 243-acre county buffer, ~19% developed reported

Compute

Not disclosed. The city plan references GPU refresh cycles (~$8.25B every six years per phase) but names no vendor inferred

Cloud operator

Not disclosed. Tenant-controlled under the lease model inferred

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Center Registry

Who keeps this record.

Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.