Crusoe · Warrenton, Warren County, Missouri
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Ameren Missouri. Serving utility (MISO); Ameren owns the on-site switchyard while Crusoe owns the substation; interconnection costs borne by Crusoe upfront under the PSC-approved large-load rate plan reported
Southland Industries. Mechanical/cooling contractor: closed-loop chip-level liquid cooling, ~120,000 gal/yr water use from the Montgomery County water district, no new wells; 337 acres in-city plus a 243-acre county buffer, ~19% developed reported
Not disclosed. The city plan references GPU refresh cycles (~$8.25B every six years per phase) but names no vendor inferred
Not disclosed. Tenant-controlled under the lease model inferred
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.