Undisclosed
Capacity not yet disclosed
12 MW
Energized today
2024
First power
SPP
Grid region · location approximate
In brief

What makes it notable.

  1. A retrofit of the former Kansas City Star press building into an AI campus, live since 2024 with 12 MW gross deployed today.
  2. GPUs on site are NVIDIA hardware, and the campus is planned to reach 35 MW with full buildout in 2026.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Evergy
Site and build
Patmos
Compute
NVIDIA
Cloud operator
Nebius
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. 2024First power
  2. Nov 2026Today
  3. 2026Full buildout
The detail

Each party's role.

Power

Evergy. Local electric utility (SPP) inferred

Site and build

Patmos. Retrofit of the former KC Star press building

Compute

NVIDIA. GPUs deployed by tenant Nebius reported

Cloud operator

Nebius. AI-native cloud platform on-site reported

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Center Registry

Who keeps this record.

Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.

Need capacity in Missouri?

Looking for GPU colocation or a campus in Missouri? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.

Tell us what you need →