Prime Data Centers · Vernon, Los Angeles County, California
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Vernon Public Utilities. Municipal utility operating as a metered subsystem inside the CAISO balancing authority; confirmed full electrical availability for the site (the scarce input in the constrained LA Basin)
Clune Construction. General contractor for the customer fit-out phase; hybrid air/liquid cooling (40 kW/rack air, up to 120 kW/rack liquid); 242,495 sq ft, six data halls reported
NVIDIA Blackwell. GPU infrastructure in the Lambda halls reported
Lambda. Lambda Cloud AI platform operated on the leased capacity reported
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in California? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.
Tell us what you need →