Prime Data Centers · Avondale, Maricopa County, Arizona
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Salt River Project (SRP). Serving electric utility; power is delivered through a dedicated on-site 250 MW substation whose Phase 1 is commissioned. SRP is a political subdivision and is not ACC-regulated, so the absence of an ACC docket is expected. reported
ARCOMurray. General contractor executing the build. Greenfield new construction, not a conversion.
Not disclosed. No chip or GPU vendor is named for PHX01 in any source inferred
Prime Data Centers. Owns and operates the campus; closed-loop air and liquid cooling, concurrently maintainable M&E
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.