TeraWulf · Hawesville, Hancock County, Kentucky
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Big Rivers Electric Corporation. Retail + MISO supply over the inherited ~482 MW smelter interconnect
Kenergy Corp. Retail-delivery co-op (Big Rivers/MISO power)
Fluor Enterprises. EPC contractor on a guaranteed-maximum-price basis for the three data center buildings (definitive agreement, Nov 2026)
TeraWulf. Brownfield redevelopment of the former Century Aluminum smelter (~750 acres); direct-to-chip liquid cooling assumed, EPC/cooling partner not disclosed inferred
Accelerator vendor undisclosed. Not yet selected; Anthropic runs NVIDIA, Trainium and TPUs inferred
TeraWulf. Data center facility operations and management
Anthropic. Runs its own AI training and inference stack as the tenant workload
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.
Looking for GPU colocation or a campus in Kentucky? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.
Tell us what you need →