Crusoe · Abilene, Taylor County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Lancium Clean Campus + on-site gas. Powered land, behind-the-meter generation reported
Crusoe (design-build). EPC, direct-to-chip liquid cooling reported
NVIDIA GB200. GPU fabric, ~1M H100-equivalents at buildout
Crusoe + Oracle Cloud. Neocloud operator
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.