Center Registry · Texas

Crusoe Abilene AI Factory Campus (Microsoft)

Crusoe · Abilene, Taylor County, Texas

Verified by Center RegistryChecked against 2 sources, including primary filings and releases
Open on the map →
672 MW
Critical IT planned
0 MW
Energized today
2027-mid
First power
ERCOT
Grid region · location approximate
In brief

What makes it notable.

  1. A greenfield campus in Abilene, Texas, with about 900 MW of behind-the-meter on-site generation plus battery storage, while staying connected to the ERCOT grid.
  2. The plan is 900 MW gross and 672 MW critical, with first power targeted for mid-2027 and no operating capacity online yet.
  3. Cooling is closed-loop and non-evaporative liquid, built for ultra-high-density compute, and the whole campus is a new build with no retrofit involved at any stage.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Behind-the-meter on-site power plant, ERCOT
Site and build
Closed-loop non-evaporative liquid cooling
Compute
Undisclosed (Microsoft-procured)
Cloud operator
Crusoe
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. Nov 2026Today
  2. 2027-midFirst power
The detail

Each party's role.

Power

Behind-the-meter on-site power plant. ~900 MW on-site generation + BESS; ERCOT-connected

Power

ERCOT. Interconnected grid region

Site and build

Closed-loop non-evaporative liquid cooling. Cooling for ultra-high-density compute (greenfield build, no retrofit)

Compute

Undisclosed (Microsoft-procured). Vendor undisclosed; NVIDIA or Microsoft Maia inferred

Cloud operator

Crusoe. Builds and operates the AI factory campus

Related sites

Nearby in the buildout.

All AI data centers in Texas →

Sources

The record behind this page.

Center Registry

Who keeps this record.

Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.

Need capacity in Texas?

Looking for GPU colocation or a campus in Texas? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.

Tell us what you need →