300 MW
Critical IT planned
0 MW
Energized today
2027
First power
PJM
Grid region · location approximate
In brief

What makes it notable.

  1. A brownfield redevelopment of former R.R. Donnelley and LSC Communications printing plants in Lancaster, Pennsylvania, with an air-cooled design per local reporting.
  2. A Turner Construction and Wohlsen Construction joint venture is building it, and a joint venture will fund about $200 million of local grid upgrades with PPL Electric Utilities on the PJM grid.
  3. Phase one is targeted for summer 2027, with expansion to 300 MW critical planned but not yet scheduled.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
PPL Electric Utilities
Site and build
Turner Construction + Wohlsen Construction JV
Compute
NVIDIA
Cloud operator
CoreWeave
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. Nov 2026Today
  2. 2027First powerphase 1 target, summer
  3. not announcedFull buildoutexpansion to 300 MW unscheduled
The detail

Each party's role.

Power

PPL Electric Utilities. PJM utility; JV to fund ~$200M of local grid upgrades with PPL

Site and build

Turner Construction + Wohlsen Construction JV. Construction JV for the full project lifecycle; brownfield redevelopment of former R.R. Donnelley / LSC Communications printing plants; air-cooled design per local reporting

Compute

NVIDIA. CoreWeave cluster (sole tenant); SKU undisclosed reported

Cloud operator

CoreWeave. AI cloud platform operates the capacity as tenant-operator reported

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Center Registry

Who keeps this record.

Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.

Need capacity in Pennsylvania?

Looking for GPU colocation or a campus in Pennsylvania? Tell us the megawatts and the date, and a reply comes back within one business day. Hold a powered site there yourself? Tell us about it.

Tell us what you need →