Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Dominion Energy. Utility; dedicated on-site 135 kV substation with roughly 306 MW capability, delivered late 2022 reported
HITT Contracting. General contractor (greenfield build) reported
Corgan. Architect; air-cooled chillers N+1 with liquid-cooled options, target PUE 1.25 reported
Not disclosed. Tenant-controlled inferred
Not disclosed. Tenant-controlled inferred