Related Digital · Saline Township, Washtenaw County, Michigan
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
DTE Energy. 1,383 MW supply agreement (~19-yr), 100% grid; MI PSC-approved (U-21990)
DTE Energy (storage). ~1,400 MW DTE-owned storage (15-yr); costs paid by Oracle (Green Chile Ventures)
Walbridge. General contractor; three 550,000 sq ft single-story buildings on a 250-acre campus, roughly 2,500 union construction jobs under a project labor agreement
Undisclosed (Oracle-procured). Undisclosed; NVIDIA likely (Stargate/Oracle pattern) inferred
Oracle (Green Chile Ventures LLC). Named in the MPSC filing as the entity that plans to build and operate the data center
Center Registry tracks the US AI data center buildout site by site. Every record is checked against primary sources: SEC filings, company releases, utility and grid operator records. A record changes when a filing changes it.